Contact UsFeedbackSitemapHome


Skip Navigation Links
 


Ahwaz Urban Railway Project

Widening and Strengthening of Andhra Pradesh State Highway (APSH9)

Planning System & Project Control of Tehran Metro, Lines 1&2 (Based on Two Contracts)

Drilling and Grouting Operations of the Tehran Metro Tunnel, Lines 1&2

Rehabilitation And Widening Of Bishkek-osh Road, Kyrgyzstan

Imam Khomeini International Airport, (phase 1) (Design and Build, “Fast-Track”)

Yadegar Imam Flyover

Afsarieh Interchange

Khasab to Al-Khalidyeh Road Project







































Amir Kabir Underground Motorway

In the past years
Client: Tehran Municipality, District 12
Contract Period: 30 Months
Commencement Date: Nov. 1995
Type of Contract: Design-Build
Location: Tehran, Iran
   
Project Outline
Today, construction of underground motorways is viewed as one of the most effective ways of dealing with ever-deteriorating traffic conditions in mega cities and to ensure full and maximum productive use of scarce land resources in urban areas.

Part of a massive effort aimed at improving Tehran's transportation infrastructures, the main objective of the project was to alleviate the existing traffic congestion in the area by providing a direct and rapid link between the city center and its eastern districts.

It was the first time in Iran that a project of such magnitude and complexity had been attempted. While greatly reducing the region's air and noise pollution, meticulous care was taken to ensure that the project did not interfere with the traditional urban morphology of the district.


Key Statistics
The nearly two kilometer long underground motorway required:
175,119 Cubic Meters of Excavation
101,000 Cubic Meters of Concrete
90,000 Square Meters of Formwork
6000 Tonnes of Reinforcement and Metalwork

Structural Features
The motorways structural components consist of a strip foundation, 2.5 meters wide and one meter thick. The main walls (south, middle, and north walls) are 60-centimeters thick, with heights ranging from 6 to 8 meters. The motorway's surface is composed of a 30-centimeter thick reinforced concrete slab, covered with a 7-10 centimeter layer of asphalt pavement.
 
 
 
   
   

 

 
Skip Navigation LinksHome > Projects > Examples of Projects > Amir Kabir Underground Motorway
Copyright © 2010 Kayson Company. All rights reserved.