Amir Kabir Underground Motorway
|
|
In the past years
Client: Tehran
Municipality, District 12
Contract Period:
30 Months
Commencement Date:
Nov. 1995
Type of Contract:
Design-Build
Location:
Tehran, Iran |
|
 |
|
| |
|
Project Outline
Today, construction of underground motorways is
viewed as one of the most effective ways of dealing with
ever-deteriorating traffic conditions in mega cities and to ensure full
and maximum productive use of scarce land resources in urban areas.
Part of a massive effort aimed at improving Tehran's transportation
infrastructures, the main objective of the project was to alleviate the
existing traffic congestion in the area by providing a direct and rapid
link between the city center and its eastern districts.
It was the first time in Iran that a project of such magnitude and
complexity had been attempted. While greatly reducing the region's air
and noise pollution, meticulous care was taken to ensure that the
project did not interfere with the traditional urban morphology of the
district.
Key Statistics
The nearly two kilometer long
underground motorway required: |
 |
175,119 Cubic Meters of Excavation |
 |
101,000 Cubic Meters of Concrete |
 |
90,000 Square Meters of Formwork |
 |
6000 Tonnes of Reinforcement and
Metalwork |
Structural Features
The motorways structural components consist of
a strip foundation, 2.5 meters wide and one meter thick. The main walls
(south, middle, and north walls) are 60-centimeters thick, with heights
ranging from 6 to 8 meters. The motorway's surface is composed of a
30-centimeter thick reinforced concrete slab, covered with a 7-10
centimeter layer of asphalt pavement.
|
|
|
|
|
|
|
|
|
|