Widening and Strengthening of Andhra Pradesh State Highway (APSH9)
|
|
In the past years
Client:
Government of Andhra Pradesh, Roads & Buildings Department
Consulting Engineers:
SEMC of Australia
Supervision Body:
SEVERDRUP
Contract Period:
24 Months
Commencement Date:
March 2000
Location:
Andhra Pradesh, India |
|
 |
|
| |
|
Project Outline
During the last decade, Kayson has invested more in the export of
technical and engineering services than any other contracting and
engineering firm in Iran's private sector, thereby acquiring a wealth of
experience in the management and implementation of overseas projects.
The Widening and Strengthening of Andhra Pradesh State Highway (APSH 9)
is just one example.
General Specifications
The project called for the widening of the
road's existing width of 5 meters to two 3.5-meter lanes, construction
of two 1.5-meter asphalt-paved and two 1-meter earth shoulders.
Surfacing
The road's surfacing consisted of a 30-centimeter subbase layer, a 25-30
centimeter base layer, a layer of bitumen, plus a 3-centimeter asphalt
layer.
| Heavy Structures |
 |
A 60-meter long bridge
with 10.25-meter spans |
 |
3 Box bridges |
| Key Statistics |
 |
Cutting
280,000 Cubic Meters |
 |
Filling and Grading
280,000 Cubic Meters |
 |
Base
150,000 Cubic Meters |
 |
Subbase
400,000 Cubic Meters |
 |
Asphalt
Pavement 160,000 Tonnes |
 |
Concrete Pavement 35,000 Cubic Meters |
 |
Gabion
30,000 Cubic Meters |
 |
Culverts 100
|
 |
Bridges
4
|
|
|
|
|
|
|
|
|
|
|