|
|
|
|
Material production, upper dam stone crusher
|
|
|
|
|
Excavation, drilling, and concrete injection, upper dam plinth
|
|
|
|
|
|
|
Excavation, main drainage gallery, upper dam
|
|
|
|
|
General view, lower dam plinth
|
|
|
|
|
Consolidation operations, left wing, upper dam
|
|
|
|
|
Cut & fill operations, lower dam spillway
|
|
|
|
|
Entrance of headrace tunnels
|
|
|