Year: Mar2006-Mar2007   Month: Aug22-Sep21

General view, lower dam
Concrete placement operations, Extruded Curb, upper dam
Excavation and concrete injection, lower dam plinth
Concrete placement operations, approach weir, upper dam spillway
Rockfill, upper dam
Formwork and concrete-lining, left headrace tunnel wall and ceiling
Excavation and concrete injection of watertight facing, upper dam plinth
Concrete placement operations, lower dam fault
Reinforcement work, by CIFA forms, left headrace tunnel
Concrete placement operations, left wing, upper dam plinth
Concrete placement operations, lower dam spillway
Rockfill material production and loading, mine #1

 

 

 

 
 