Scope of work:
IRI railways (aim at improving- tend to improve the capacity of railway
services on Shabnam-Moshk railway within constructing “Line2 “of it. “Line1” is
a single line railway with Ballast covering.
“ Line2” is going to lay next to “ Line1“ or combining in some areas with the
minimum interval space of 5 meters so that the surface of the main foundation of
the two lines would be at least 11 meters. “Line 2” must be constructed and
enforced with Ballast covering and minimum resistance of 3D tones.
The estimated speed for the new line (Line 2) is 160 km/h. The total length
of Shabnam-Moshk railway Project is 46.6 km with 3 stations in “ Shabnam “ , “
Shiraz “ and “ Varzaneh“.
Key statistic:
- Earth Work: 1,455,512 m3
- Culverts: 131
- Ballast: 123,958 m3
- Rail: 46,6 Km
- Switch Point: 55