East Ahwaz Wastewater Treatment Plant

Project Overview

Ahwaz, the center of Khuzestan Province, is located 850 kilometers from Tehran, and is divided into two parts, eastern and western, by the only navigable river in the country. Karun River provides drinking water for Ahwaz, as well as water for the agricultural and industrial needs of the region. Within five kilometers of the city, the Maleh River runs north-south, eventually flowing into the Shadagan marshland after about 80 kilometers. The entry of human waste into this river has prompted Ahvaz water and sewage officials to provide the necessary facilities to prevent the entry of waste into it, treat the waste, and then discharge the treated water into this river. The East Ahvaz Sewage Treatment Plant Project is designed to treat the eastern part of this city, which has a population of about 522,000 people and produces about 112,000 cubic meters of sewage per day. This treatment plant was built with advanced Sequencing Batch Reactor technology.

Wastewater treatment steps

Preliminary Treatment Unit: Includes Screening and Grit & Grease Removal Basin equipment, which captures large particles (wood, plastic, stone, etc.) and small particles (grease grains and sand) in order to prevent damage to the treatment plant equipment.

Biological Treatment: This treatment is carried out inside the SBR tank structure.

Final Treatment: In this stage the water is disinfected before leaving the treatment plant. Disinfection is carried out in the eastern part of Ahvaz wastewater treatment plant by means of a UV device.

Sludge Unit: Includes a sludge storage tank, a submersible pump station, a condensation and filtering area, and a sludge drying area (in order to use the stabilized sludge for agricultural purposes).

It is worth mentioning that the construction of a municipal wastewater treatment plant with SBR technology with these dimensions has been carried out for the first time in Iran.

Project Statistics

Embankment 420,328 m³
Concrete operation 40,000 m³
Formwork 40,000 m²
Reinforcement 3,000 t
Metal work 1,200 t
Ancillary buildings area 2,500 m²

Photo Gallery

Main Related Projects:

  • Bandar Abbas Water Desalination Plant
    Bandar Abbas Water Desalination Plant
  • Procurement & Construction of Main Sewerage Line in Tehran Municipal Districts of 2 ,5 & 9 – Lot 1 Pipejacking Method
    Procurement & Construction of Main Sewerage Line in Tehran Municipal Districts of 2 ,5 & 9 – Lot 1 Pipejacking Method
  • Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method
    Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method
  • East Anzali Wastewater Treatment Plant
    East Anzali Wastewater Treatment Plant
  • Al-Kifil Water Treatment Plant and Transmission Lines Project
    Al-Kifil Water Treatment Plant and Transmission Lines Project
  • Al-Nasseriya Water Treatment Plant and Transmission Lines Project
    Al-Nasseriya Water Treatment Plant and Transmission Lines Project
  • Mashhad Wastewater Treatment Plant (Al-Teymour)
    Mashhad Wastewater Treatment Plant (Al-Teymour)
  • Hamedan Sewerage Project by Pipe-jacking Method
    Hamedan Sewerage Project by Pipe-jacking Method
  • Siah Bishe Pumped Storage Project Upper & Lower Dams
    Siah Bishe Pumped Storage Project Upper & Lower Dams
  • Sattarkhan (Ahar) Clay Core Earth Dam and Related Facilities
    Sattarkhan (Ahar) Clay Core Earth Dam and Related Facilities
  • Poldasht Irrigation & Drainage Network
    Poldasht Irrigation & Drainage Network
  • لوگو پرگار وب
    طراحی سایت و سئو سایت توسط پرگار وب