Oil, Gas & Industry

Following through on a strategic decision to focus on more promising markets in which a competitive edge can be built and maintained, Kayson has launched a major effort to expand the scope of its operations in Iran’s vast and growing Oil, Gas & Industry sectors.
As Iran’s first EPC private-sector contractor, Kayson directly/through its subsidiaries and partners, offers a wide array of services ranging from design to procurement, management & construction for energy & industrial projects. Structuring each project to meet the individual needs of our clients, we will put together an optimum engineering, procurement and construction team best suited to the project.

Main Areas of Expertise

  • Refineries & Petrochemical Plants
  • Pumping & Compressor Stations
  • Power Generation Plants, Power Transmission & Substations
  • Industrial Manufacturing Plants
  • Pipelines & Tank Farms
  • Gas Injection Projects

Main Related Projects:

  • Sangan 2.5 MTPY Iron Ore Concentration Plant
    Sangan 2.5 MTPY Iron Ore Concentration Plant
  • Civil Works and Mechanical Instalation Works of Sabalan Petrochemical Projects
    Civil Works and Mechanical Instalation Works of Sabalan Petrochemical Projects
  • Gol-E-Gohar Pelletizing Plant II
    Gol-E-Gohar Pelletizing Plant II
  • South Pars Gas Field Development – Phase 12 Onshore Facilities Liquid Processing and Utilities (EPC 2)
    South Pars Gas Field Development – Phase 12 Onshore Facilities Liquid Processing and Utilities (EPC 2)
  • 7200 Tonne/Day Saveh Gray Cement Plant, Production Lines
    7200 Tonne/Day Saveh Gray Cement Plant, Production Lines
  • 4TH Aromatics Plant, Process Area
    4TH Aromatics Plant, Process Area
  • South Pars, Phases 4&5, Site Preparation
    South Pars, Phases 4&5, Site Preparation
  • Aghajari Gas Injection Project
    Aghajari Gas Injection Project
  • Neka-Ray Crude-Oil Pipeline Pumping Stations and Related Installations
    Neka-Ray Crude-Oil Pipeline Pumping Stations and Related Installations
  • South Pars Field Development Project, Phases 2&3, Site Preparation
    South Pars Field Development Project, Phases 2&3, Site Preparation
  • Almahdi Aluminum Complex (8 Separate Contracts)
    Almahdi Aluminum Complex (8 Separate Contracts)
  • Aliabad Katoul-Shahrood 70 Km, 16” Gas Pipeline
    Aliabad Katoul-Shahrood 70 Km, 16” Gas Pipeline
  • لوگو پرگار وب
    طراحی سایت و سئو سایت توسط پرگار وب