Almahdi Aluminum Complex (8 Separate Contracts)

Project Outline

Almahdi is one of the largest and most modern aluminum smelting plants in the Middle East. The Plant’s first phase became operational in mid-1997 with a production capacity of 110,000 tonnes of pure aluminum ingot per year, meeting nearly 80% of Iran’s current needs. As the second and third phases of the project come online within the next few years, annual output will reach 220 and 330 thousand tonnes respectively, thus making Iran not only totally self-sufficient in its domestic requirements well into the new century, but also providing a surplus enough to supply the nation’s export markets in the foreseeable future.

Construction Time and Kick-off Date of Each Contract

  • Civil engineering work of phase 1: 24 months, 1992
  • Manufacture and sale of steel structures of the potroom: 7.5 months, 1993
  • Transportation and installation of potroom’s steel structures: 9 months,1993
  • Zinc factory: 6 months, 1994 (Client: Iran Mineral Processing Co.)
  • Civil engineering works of P.F.T.P. units 1 & 2: 10 months, 1994
  • Wastewater network and landscaping: 8 months, 1995
  • Anode-rodding and pallet storage: 30 months, 1995
  • Electrical substation and rectifier: 20 months, 1997

Main Features

  • Design, Manufacture and Installation of Machinery and Equipment
  • Civil Engineering Work Relating to Pot Repair Shop, Warehouse, Workshop, with a Total Area of 64,000
  •  Square Meters.Installation of a Substation, Rectifier & Auxiliary Facilities
  • Anode Rodding Plant: 17,000 Square Meters
  • Zinc Smelting Plant: 10,000 Square Meters
  • Surface Water Network: 5200 Meters
  • Earthwork: 408,500 Cubic Meters
  • Concrete: 120,000 Cubic Meters
  • Reinforcement: 9,980 Tonnes
  • Steel Structures: 2,290 Tonnes
  • Formwork: 134,000 Square Meters

Photo Gallery

Main Related Projects:

  • Sangan 2.5 MTPY Iron Ore Concentration Plant
    Sangan 2.5 MTPY Iron Ore Concentration Plant
  • Civil Works and Mechanical Instalation Works of Sabalan Petrochemical Projects
    Civil Works and Mechanical Instalation Works of Sabalan Petrochemical Projects
  • Gol-E-Gohar Pelletizing Plant II
    Gol-E-Gohar Pelletizing Plant II
  • South Pars Gas Field Development – Phase 12 Onshore Facilities Liquid Processing and Utilities (EPC 2)
    South Pars Gas Field Development – Phase 12 Onshore Facilities Liquid Processing and Utilities (EPC 2)
  • 7200 Tonne/Day Saveh Gray Cement Plant, Production Lines
    7200 Tonne/Day Saveh Gray Cement Plant, Production Lines
  • 4TH Aromatics Plant, Process Area
    4TH Aromatics Plant, Process Area
  • South Pars, Phases 4&5, Site Preparation
    South Pars, Phases 4&5, Site Preparation
  • Aghajari Gas Injection Project
    Aghajari Gas Injection Project
  • Neka-Ray Crude-Oil Pipeline Pumping Stations and Related Installations
    Neka-Ray Crude-Oil Pipeline Pumping Stations and Related Installations
  • South Pars Field Development Project, Phases 2&3, Site Preparation
    South Pars Field Development Project, Phases 2&3, Site Preparation
  • Aliabad Katoul-Shahrood 70 Km, 16” Gas Pipeline
    Aliabad Katoul-Shahrood 70 Km, 16” Gas Pipeline