Dualization of Shabnam-Moshk Railway Track
Scope of work:
IRI railways (aim at improving- tend to improve the capacity of railway services on Shabnam-Moshk railway within constructing “Line2 “of it. “Line1” is a single line railway with Ballast covering.
“ Line2” is going to lay next to “ Line1“ or combining in some areas with the minimum interval space of 5 meters so that the surface of the main foundation of the two lines would be at least 11 meters. “Line 2” must be constructed and enforced with Ballast covering and minimum resistance of 3D tones.
The estimated speed for the new line (Line 2) is 160 km/h. The total length of Shabnam-Moshk railway Project is 46.6 km with 3 stations in “ Shabnam “ , “ Shiraz “ and “ Varzaneh“.
Key statistic:
- Earth Work: 1,455,512 m3
- Culverts: 131
- Ballast: 123,958 m3
- Rail: 46,6 Km
- Switch Point: 55