Construction of a Bridge Across The Wadi Bani Souq in Wilayat Rustaq, Oman
Project Outline
The purpose of performing the project is to build Two Identical Bridges over the Wadi Bani Souq and simplify the traffic during the rainfall in Wilayat Rustaq.
Scope of Work
- Site installation
- Construction of Two Identical concrete Bridges for each roadway bridge with 7 spans, Each span 28 meters with a total length of 196 meters
- Construction of 1.5 km main road
- Lightening of the road
- Installation of road marking and traffic signs
- Construction of culvert box
- landscaping
Key Statistics
- Obstruction Removals: 2,195 m³
- Excavation: 230,904 m³
- Fillings: 75,047 m³
- Concrete Works: 13,027 m³
- Formworks: 31,418 m²
- Reinforcement And Prestressed Cables: 1585 T
- Sub-Base Material: 14,079 m³
- Base Material: 8,842 m³
Bituminous Prime Coat: 44,211 m² - Bituminous Tack Coat: 40,433 m²
- Paintings: 33,598 m²