Construction Work of Sangmelima – Mekok – Bikoula (65 Km. Road) in Republic of Cameroon

Project Outline

Construction works of the Sangmelima – Ouesso road, Lot 1: Sangmelima – Djoum, Section 1: Sangmelima – Mekok – Bikoula (65 km), Situated in the Dja et Lobo Division, south region.

Scope of Works

Road Component:

  • Site installation
  • Construction studies
  • Preparatory works
  • Earthworks
  • Execution of a 7.5 m wide carriageway with 2×2 m double surface paved shoulders each in build-up areas
    The carriageway structure comprises the following:
    – Construction of drainage structures (concrete box and ring culverts, slaps, ditches, etc.)
    – Construction of bridges
    – Realization of road equipment, signing and marking
    – Construction of a weighing station for heavy duty vehicles, including a parking area of 50,000 m2
    – Construction of a weighing station between Sangmelima and Djoum
    – Installation of an automatic metering post
    – Implementation of road protection measures

Drainage Structures Component:

  • The works consist of the construction of five 2 × (2.5 m × 2.5 m) double slaps and 3 triple 3 × (2.5 m × 2.5 m) slaps.
  • Characteristics common to the major slaps:
    – Carriageway width: 7.50 m
    – Shoulder width: 2 × 1.50 m

Photo Gallery

Main Related Projects:

  • Construction of Export Gas Condensate Pipelines of Northern and Southern Lines, Construction of Concentrated Tank Farms Project, Pars Special Economic Zones (Assaluyeh), Phase 2
    Construction of Export Gas Condensate Pipelines of Northern and Southern Lines, Construction of Concentrated Tank Farms Project, Pars Special Economic Zones (Assaluyeh), Phase 2
  • The Honar Lake in Abbas-Abad Land
    The Honar Lake in Abbas-Abad Land
  • Prilesie Logistic Center
    Prilesie Logistic Center
  • Civil Works and Underground Piping of Olefin Unit in Bushehr Petrochemical Complex
    Civil Works and Underground Piping of Olefin Unit in Bushehr Petrochemical Complex
  • Construction of a Bridge Across The Wadi Bani Souq in Wilayat Rustaq, Oman
    Construction of a Bridge Across The Wadi Bani Souq in Wilayat Rustaq, Oman
  • Construction of Akuetom- Mocomo- Djibloo- Bizam road in D’Anisok district in Guinea Equatorial
    Construction of Akuetom- Mocomo- Djibloo- Bizam road in D’Anisok district in Guinea Equatorial
  • Khasab to Al-Khalidyeh Road Project
    Khasab to Al-Khalidyeh Road Project
  • Widening and Strengthening of Andhra Pradesh State Highway (APSH9)
    Widening and Strengthening of Andhra Pradesh State Highway (APSH9)
  • Rehabilitation And Widening Of Bishkek-osh Road, Kyrgyzstan
    Rehabilitation And Widening Of Bishkek-osh Road, Kyrgyzstan
  • Imam Khomeini International Airport, (phase 1) (Design and Build, “Fast-Track”)
    Imam Khomeini International Airport, (phase 1) (Design and Build, “Fast-Track”)
  • Amir Kabir Underground Motorway
    Amir Kabir Underground Motorway
  • Yadegar Imam Flyover
    Yadegar Imam Flyover
  • Afsarieh Interchange
    Afsarieh Interchange
  • لوگو پرگار وب
    طراحی سایت و سئو سایت توسط پرگار وب